Accelerating Battery Testing with Custom Test Chambers for Renewable Energy Startup

Challenge

An innovative energy storage company needed a fast, customized solution for scaling up battery testing at its facility, which housed over 60 small-scale test stands. Their vision was to retrofit standard lab incubators into fully integrated custom test chambers—capable of supporting their unique battery module configurations and live data systems.

  • Incomplete Design Package: The company only had a CAD model and loosely defined specifications—no prints, work instructions, or finalized documentation.
  • Compressed Build Schedule: A delay in the core incubator component delivery left just four weeks to build and deliver seven complete test units on an aggressive one-month timeline.
  • Complex Integration Scope: The project required custom mechanical fabrication, electrical interface design, and seamless fit into the customer’s live test environment.

Navigating these constraints called for a partner with the engineering depth, manufacturing agility, and program discipline to translate limited inputs into fully functional, production-grade custom test chambers.

Solution

Selected for its proven ability to execute complex electro-mechanical builds under accelerated timelines, PEKO took full ownership of the program. The scope included engineering and fabricating custom frames for control hardware, integrating electrical cabling for battery module connectivity, and delivering fully operable units ready for deployment within the customer’s live test environment.

To successfully execute the program, PEKO applied a lean, cross-disciplinary approach focused on speed, adaptability, and alignment. The NPD team coordinated closely with manufacturing, using structured project management and on-the-floor engineering support to drive real-time problem-solving and keep the build on track.

  • Parallel Development: Subassemblies were fabricated in advance using only CAD files and inferred design intent, allowing work to begin before critical incubator components arrived.
  • Lean Documentation: Instead of a full manufacturing package, PEKO developed lean, targeted assembly instructions—just enough to keep floor technicians moving quickly and accurately.
  • Integrated Teams: Engineers and technicians worked side-by-side throughout the build, enabling real-time collaboration, rapid design adjustments, and hands-on troubleshooting.

This agile execution model enabled PEKO to translate incomplete inputs into fully integrated, custom test chambers. By combining lean documentation, real-time engineering support, and continuous customer collaboration, the team successfully delivered a complex electromechanical solution on an accelerated timeline—without compromising quality, functionality, or schedule integrity.

SUccess

PEKO delivered 7 custom test chambers 5 weeks ahead of schedule. The final systems exceeded performance of the customer’s legacy setup, accelerating their battery testing capacity and allowing them to hit internal product development goals.

“The customer was extremely happy with our ability to ship early, especially given the lack of starting documentation. They saw the value of working with a full-service partner.”

This project showcased PEKO’s ability to deliver production-grade solutions from incomplete inputs, manage cross-functional complexity, and maintain a customer-first mindset under tight constraints. It also demonstrated PEKO’s ability to jump into any stage of the product lifecycle—bringing structure, clarity, and execution to drive concepts across the finish line.


Get in touch with us today to see how PEKO Precision can meet the needs of your project.

Request A Quote

Accelerating Battery Testing with Custom Test Chambers for Renewable Energy Startup

Executive Summary

Industry: Alternative Energy
Company Type: Startup
Location: New England Region

Timeframe

  • Built 7 complete units in 5 months
  • Shipped 5 weeks before schedule

Capabilities Utiilized

Results

  • Delivered 7 fully-integrated test units 5 weeks ahead of schedule
  • Units integrated seamlessly into customers live test environment
  • Improved performance and scalability over legacy/competitor systems
  • Enabled on-time product development milestones for customer